If there is any doubt in your mind about the fastest and most
cost-effective way to handle marginal soils, the I-15 project in Salt
Lake City, Utah should establish once and for all the obvious
advantages of the utilization of Geofoam over ANY OTHER light weight fill or
soil treatment approach.
In this massive civil engineering project, over 100,000 cubic
yards of EPS Geofoam was used for the following reasons:
- There were delicate utilities, including a major fiber optic
bus, passing beneath the area where the highway was to be widened.
Even with the use of state of the art single and two stage MSE
walls, there were still expected settlements of up to a meter or
more.
- There were considerable incentives to the contractor to finish
the job on time. There is nothing you can do to marginal soil that
is as quiet, as environmentally benign, or as FAST as utilizing
geofoam to create a strong and predictable fill.
- The use of Geofoam is NOT expensive, compared to other soil
improvement approaches. In fact, it can often be significantly
less expensive than traditional soil reinforcement approaches. No
wick drains are required. No surcharging is required. No
particular weather is required. When you compare the "installed"
cost of geofoam to any other approach including surcharging and
wick drains, Geofoam wins. And the job is done in less than 1/4th
the time!
You can access a set of the construction drawings used in the I-15
project by clicking here.
To learn more about GeoTech's TerraLite Geofoam, click
here.